Reply to note on The common due-date early/tardy scheduling problem on a parallel machine under the effects of time-dependent learning and linear and nonlinear deterioration


TOKSARI M. D. , Guner E.

EXPERT SYSTEMS WITH APPLICATIONS, cilt.39, ss.6657-6658, 2012 (SCI İndekslerine Giren Dergi) identifier

  • Cilt numarası: 39 Konu: 7
  • Basım Tarihi: 2012
  • Doi Numarası: 10.1016/j.eswa.2011.11.124
  • Dergi Adı: EXPERT SYSTEMS WITH APPLICATIONS
  • Sayfa Sayıları: ss.6657-6658

Özet

We present that the example solved for Theorems 1 and 2 proposed by Toksari and Guner [Toksari, M. D., & Guner, E. (2010). The common due-date early/tardy scheduling problem on a parallel machine under the effects of time-dependent learning and linear and nonlinear deterioration. Expert Systems with Applications 37(1), 92-112] in [Yunqiang Y., Dehua X., & Xiaokun H. (2011). Notes on "The common due-date early/tardy scheduling problem on a parallel machine under the effects of time-dependent learning and linear and nonlinear deterioration". Expert Systems with Applications] is incorrect. They obtained wrong solution to example because they wrongly analyzed the both theorem. On the other hand, in the theorems proposed by Toksari and Guner (2010), a job completes on the common due date. We show that the correct solution for the given counterexample. The solution proves the Theorems 1 and 2 proposed by Toksari and Curler [Toksari, M. D., & Guner, E. (2010). The common due-date early/tardy scheduling problem on a parallel machine under the effects of time-dependent learning and linear and nonlinear deterioration. Expert Systems with Applications 37(1), 92-112] are correct. (C) 2011 Elsevier Ltd. All rights reserved.